Upper Seti Hydropower Project

Developer: Jhayamolongma Hydro Power Development Pvt. Ltd
Project: Upper Seti  Hydropower Project
District: Kaski
Location of Project Site: Machhapuchchhre Rural Municipality
Water Source : Seti Khola
Type of Scheme : RoR
Installed Capacity : 32000 KW
Gross head : 248.45m
Rated Design head : 241.85 m
Design Discharge : 15.30m3/s
CatchmentArea hydrology : 234 km²
Head works : D- Shaped weir 12.50m
Weir Crest Elevation : EL 1516 m
Under sluice : Vertical lift fixed wheel type
Intake Type : Side Intake with 9.00 m * 2.80m
Desander : Surface
Penstock Pipe : Exposed Surface  2030m -2.50m
Pipe Material : Mild steel (IS 2062-B)
Length : 850.50m
Powerhouse : Surface Rcc (28.00m x20.00m)
Tailrace : Rectangular  RCC, 252.17m
Turbine : Vertical axis francis
Transmission : 7km, 132kV Single Circuit
Interconnection/Metering Point : NEA 132 kV at Baskot Hemja Substation
Deemed Generation : 169.157GWh
Construction Started : 2074 Ashwin
COD/Commissioned date : 2079  Baishak 12 Purposed
Rate per unit of energy : Rs 4.80 for wet season and 8.40 For dry season.
Annual Revenue : Rs 86 crore, 74 Lakh, 27 thousand, 943.
Project Cost without IDC : Nrs 3,80,80,00,000
Total Cost at Commissioning : Rs 5 Arba 71 Crore Estimated