Madkyu Khola Hydropower Project

Developer : Sikles Hydro Power Pvt.Ltd
Project : Madkyu Khola Hydropower Project
District : Kaski
Location of Project Site : Todi and Parhche VDC
Water Source : Madkyu Khola
Type of Scheme : RoR
Access Road : 36 Km upto Sikles Village, 12 Km from sikles village to power House and 4 Km power house to Head works site.
Installed Capacity : 13000 kW
Gross head : 1485 m
Design Discharge : 3.71 m3/s
Catchment Area at Intake : 71.3Km²
Head works : Stone lined free flow weir 18m
Weir Crest Elevation : EL 1738m
Under sluice length : 3m
Intake Type : Side Intake with coarse rack
Connecting Tunnel to pipe desander : 95m and 2.0 diameter
Headrace Canal : 1.45m
Desander : Underground and Rectangular with single basin.
Penstock Pipe : Exposed Steel Pipe
Length : 660 m
Powerhouse  : Surface (30.6m *18.9m*10.7m)
Tailrace : RCC Rectangular, 30.0m
Turbine : Pelton, Horizontal axis, two
Transmission  :    26.35km, 132kV
Interconnection/Metering Point : NEA 132 kV at Lekhnath Substation
Deemed Generation : 58.945.33 GWh
Construction Started : 2068 Kartik
COD/Commissioned date : 30 Magh, 2074 Purposed
Rate per unit of Energy : Rs 4 on wet season and Rs 7 for dry season for  9968 KW, and Rs 4.80 for wet season and Rs 8.40 for dry season for 3000 Kw.
Project Cost without IDC : 1 Arba 48 Crore 99 Lakhs
Annual Revenue : About 30 Crore 29 Lakhs 83 Thousand 535
Total Cost at Commissioning : 2 Arba 17 Crore