Bijayapur II Small Hydropower Project

Developer    Civil Hydro Power Pvt. Ltd
Project : Bijayapur II Small Hydropower Project
District : Kaski
Location of Project Site : Lekhnath Municipality -3
Water Source : Bijayapur Khola
Type of Scheme : Cascade of Bijayapur Hydro Power Project I
Installed Capacity : 4500 KW
Gross head : 57m
Rated Design head : 54.39 m
Design Discharge : 9.80m3/s
Catchment Area hydrology : 63.50 km²
Head works : Rectangular with flushing
Weir Crest Elevation : EL681.35 m
Penstock Pipe     : Steel Pipe 2427 m  10mm- 16mm thickness
Pipe Material : Steel
Length : 2427m
Powerhouse : Surface  (25.20.00m x20.00m* 11.83mm* 9.76 m)
Tailrace : Rectangular  RCC, 252.17m
Turbine : Horizontal axis francis
Transmission : 3.3km, 33kV Single Circuit
Interconnection/Metering Point : BSHO I HP Switchyard then Common Line to Nea Lekhnath substation.
Average annual energy after outage. : 28..973GWh
Construction Started : 2074 Ashwin
COD/Commissioned date : 2075  Ashadh 32 Purposed
Rate per unit of energy     Rs 4.80 for wet season and 8.40 For dry season. Escalation up to 5 Years
Annual Revenue : Rs 15 Crore, 99 Lakh, 14 Thousand, 167.
Project Cost without IDC : Nrs 718 Million
Total Cost at Commissioning : Rs 957 Million