Developer : Bhagawati Hydropower Development Company (p) Ltd
Project : Bijayapur-I Small Hydropower Project
District : Kaski
Location of Project Site : PokharaLekhnath Municipality
Water Source : BijayapurKhola + Irrigation Drainage
Type of Scheme : RoR
Access Road : 2 km
Installed Capacity : 4500 kW
Gross head : 68.0 m
Rated Design head : 65.4 m
Design Discharge : 8.3 m3/s
Catchment Area at Intake : 65.3 sq km
Probability of Excedance : 45 %
Headworks : Stone lined free flow weir 30m
Weir Crest Elevation : EL 752 m
Under sluice : 2 vertical sluice gates
Intake Type : Side Intake with coarse rack
Connecting Channel : 60m RCC Rectangular closed canal
Gravel Trap : RCC Rectangular (7 × 3.5 )
Headrace Canal : 242m RCC closed canal
Desander : RCC Dufour Type × 2 basins with forebay at the end
Penstock Pipe : Welded Ribbed Pipe 2.5m dia
Pipe Material : Mild steel (IS 2062-B)
Length : 634 m
Number of Supports : 206 nos.
Number of Anchor Blocks : 10 nos. including Y and Bellmouth block
Powerhouse : Surface (23x11m) with outdoor switchyard
Tailrace : Cut and Cover RCC, 302m
Turbine : Horizontal shaft Francis 2 units
Transmission : 4 km, 33kV Single Circuit
Interconnection/Metering Point : NEA 132 kV at Lekhnath Substation
Deemed Generation : 29.33 GWh
Construction Started : 2067 Kartik
COD/Commissioned date : Bhadra 05, 2069
Rate per unit of energy : Rs 4.80 for wet season and 8.40 For dry season.
Project Cost without IDC : 71 crore
Total Cost at Commissioning : 80 crore